New Belgium Brewery Liquid Center

Date Completed: 2016

Location: Fort Collins, CO

Construction Type: New Construction Addition

Architect: Open Studio Architecture

Contractor: Brinkman Construction

The building structure designed for this tasting room addition consisted of exposed heavy timber with Structural Insulated Panels on the roof supported with hybrid steel and timber trusses. Derek Henderson is Engineer of Record.