Date Completed: 2014
Location: Cherry Creek, CO
Construction Type: Wall shoring for new high school swimming pool
Contractor: Hayward Baker
Anthem assisted Hayward Baker, now Keller, in temporarily stabilizing the existing foundation walls at Cherry Creek High School with a vertical shoring system in order to remove and replace the existing pool and supporting deck structure. This swimming pool was embedded in the structural slab of a pool house structure, so as its replacement became necessary, the pool house volume needed additional structural support during the pool’s replacement.