Cherry Creek Wall Stabilization

Date Completed: 2014

Location: Cherry Creek, CO

Construction Type: Wall shoring for new high school swimming pool

Contractor: Hayward Baker

Anthem assisted Hayward Baker, now Keller, in temporarily stabilizing the existing foundation walls at Cherry Creek High School with a vertical shoring system in order to remove and replace the existing pool and supporting deck structure. This swimming pool was embedded in the structural slab of a pool house structure, so as its replacement became necessary, the pool house volume needed additional structural support during the pool’s replacement. 

Copyright © 2022 Anthem Structural Engineers