Boulder, CO

Architect

Contractor

Construction Type: Flood Assessment

Owner: City of Boulder

Conducted as a preventative measure to support the Boulder Valley region, Anthem completed a flood assessment of existing structures in the Boulder Creek floodplain to determine their feasibility of withstanding a 100-year flood. Our team then subsequently developed a set of flood-proofing improvement recommendations for the City, submitted in a report format for long term capital planning.

Interested in a future with Anthem Structural?