Coal Creek Canyon Structures

Date Completed: 2018

Location: Coal Creek Canyon, CO

Construction Type: Culvert/Bridge Access Structures

Contractor: American West

This project is part of a stream restoration project to repair damage from the 2013 flood, as well as to increase the capacity of the floodway. The project features two cast-in-place concrete culverts – Skyline Drive over Coal Creek, and a home access structure – as well as various rockeries armoring and retaining the banks.

Copyright © 2019 Anthem Structural Engineers