The project involved the construction of a new mid-mountain lift platform, along with an attached maintenance building and site walls. Anthem also designed and installed foundations for a food & beverage Sprung tent structure. At the base of the mountain, the team engineered the site walls and ski lift access platform for the Wild Blue Gondola terminal and the relocated Christie Base ski lift.
As part of the first phase of the Wild Blue Gondola project, Anthem was responsible for the design of the lower terminal, site retaining walls, and accessory buildings. Additionally, Anthem designed the mid-station maintenance building, platform framing, and surrounding grading, ensuring successful coordination with the gondola supplier throughout the process.